Mechanical Filming / blog / animation cost
How much does 3D product animation cost?
The honest answer: for mechanism work, most projects we quote land between roughly $450 and $4,000. What moves the number is the part count and whether drawings already exist — not how long the film runs.

The short answer
- A single mechanism, short film
15–30 seconds, one mechanism moving$450–1,500 - A full teardown and assembly
every part lifted off, named, then rebuilt$1,125–4,000 - An interactive version
runs in a browser, viewer drives itfrom $1,875
These are the bands our own quotes fall into, not a rate card. Every project is priced on what it actually involves, and we tell you the number before anything is built.
Why “cost per minute” is the wrong question
Most animation pricing is quoted per minute, which works for a camera move around a finished product. It falls apart on mechanisms.
The expensive part of a mechanism film is building the mechanism. Once a gear train exists and meshes correctly, running it for two minutes instead of twenty seconds costs very little extra. So a twenty-second close-up of an escapement releasing can cost more than two minutes of a product turning on a plinth — the seconds are cheap, the geometry is not.
Ask what the model costs to build, then treat the length as almost free.
The five things that move the price
- Part count, and how many of them move. Twelve parts that all turn is a bigger job than forty that sit still.
- Whether drawings or CAD exist. This is the single biggest factor. With CAD we model to it directly. Without it we measure from photographs and reconstruct, which adds days.
- How much has to move. A static exploded view is far less work than a full operating cycle with correct timing.
- Film or interactive. An interactive piece needs the model optimised to run in a browser, which is extra engineering on top of the animation.
- Formats and revision rounds. One 16:9 master is cheaper than that plus vertical cuts, stills, labelled versions and three rounds of changes.
How to make it cost less
- Send drawings, CAD or a parts list, even rough ones. Nothing saves more money.
- Reuse a model. Once a mechanism is built, further films from it are a fraction of the first.
- Ask for the formats you will actually use.
- Gather your feedback into one round rather than several.
How we quote
Send the product, what the film should show and where it will run. We come back with a plan and a price. Before anything is animated you approve a single lit still, so the look and the accuracy are settled while changes are still cheap.
Questions we get asked
Do you charge per minute?
No. On mechanism work the cost sits in the modelling, not the running time, so a twenty-second escapement close-up can cost more than two minutes of a simple product turntable. We quote the project, not the second.
Can you work from CAD, or do you need the part?
CAD is ideal: STEP, OBJ, FBX and similar formats all work, as do PDF drawings and parts lists. Where no drawings exist we can model from measured photographs, which takes longer and costs more.
How long does a project take?
A single mechanism film is usually a few days once the drawings are in and the sign-off frame is approved. Larger teardown and assembly films run longer because every part is built.
Can the animation be made interactive?
Yes. The same model can be built to run in a browser so a viewer lifts the parts off and puts them back themselves, embedded in a course page or a product page.
Commissions open · request a quote
Tell us what moves.
Send the product, what it should show, and whether you want a film, an interactive piece, or both.
Related